The works involved the construction of two extensions to a special needs school along with associated external playground works. Civils works included:
- Formation of a temporary highway crossover and haul road to provide access to the extensions at the rear of the school
- Re-location of the existing attenuation tank along with an increase in its volume
- Piled foundations and suspended insulated PCC floor slabs
- Drainage and external works
- Construction of new car parking and playground areas with permeable surfacing and sub-base
- Soft Landscaping